Dolphin Park & Ride
This $15,900,000, Design Build project consisted of a new 15-acre transit facility, the Dolphin Station Terminal Facility. Miami Dade County Expresswat Authority. SHC provided construction services to build two 540’ covered bus bay canopies, a connecting circular concrete canopy walkway, a transit hub building with passenger waiting areas, continuous sidewalks, covered pedestrian walkways, secured bicycle storage units, bicycle racks, bus canopy benches, monument signs, and a driver’s break lounge building. Desing Build Team- Halley Enginering, Stonehenge Constrution, LLC, V3 Architectural Group and BCC Engineering.