COPE Center North

Project includes the installation of a new 40’ x 60’ shade structure over existing playground, major mechanical improvements including the replacement of cooling system components and more.

Africair Headquarters

2-Story, 18,000 SF Commercial Office Building, Pre-Cast Reinforced Concrete Joist System, Electrical Power, Custom Office Finishes, Building Enhancements, Fire Sprinkler System, Upgraded Landscape

Coconut Palm K - 8 Academy

The scope of work included constructing a new 12-classroom building and covered walkways, building 6 new parking spaces, and relocating existing basketball courts.

El Floridita Restaurant

3,000 SF El Floridita Restaurant Front of the house and back of the house improvements.

Galloway Professional Building

Improvements and modernization of a 42,000 SF two-story office building. SHC is providing Design-Build services along with architect Deforma studio.

Palm Springs Elementary

The scope of work included: Exterior painting at Bldg. 1 through 10 including stucco repairs. New HVAC at Buildings 01.02,03,04,05, 06, 07 and 10. New EMS for HVAC. New roofing on walkway decks C, D and E and Buildings 06 07 and 10.

Miami Beach Lummus Park

Outdoor exercising park on world famous South Beach.

Senator Villas

This $4,978,776, Design Build Project consisted of a 20,000 sf, 2 Story, 23-Unit affordable senior living facility of Miami Dade County Public Houseing. Other improvements include site preparations for a new bus shelter as well as landscaping and sidewalk improvements on the north side of Bird Road. Design Build Team, Stonehenge Construction, V3 Architectural Group and BCC Engineering.

Hubert O. Sibley

This project included playground repairs along with the installation of a new various new safety features and refurbishments.

Pump Station 14 Reconstruction

The scope of the project consisted of furnishing and installing all necessary upgrades to Sewage Pump Station 14. This included the excavation and demolition consisting of removing and abandoning the existing dry well, manholes, wet well, existing generator building, concrete slabs, sidewalks, and structural elements. Additionally, providing a 24-hour manned bypass pump with primary and backup pumps. The scope of work included the construction of 2 wet wells, a dry well, and new manholes, the modifications of dry well pumps, motors, valves, piping and fittings, and new access hatches. The installation of all new electrical and electrical panels, 2000-gallon diesel stationary generator, installation of RTU panel SCADA equipment, 6’ decorative aluminum fencing with rolling gates, new sidewalks, asphalt, milling, and resurfacing of 54 Street, and modern landscaping.

Construction Management
& General Contractor Services

Stonehenge Construction has a team of experienced General Contractors, Construction Managers, and Engineers working towards the common goal of completing projects on time for the right budget, without sacrificing quality.
PROUD MEMBER OF

THE STONEHENGE WAY

The “Stonehenge Way” encompasses our core values of reliability, honesty, integrity, professionalism, and transparency.
  • RELIABILITY
  • HONESTY
  • INTEGRITY
  • PROFESSIONALISM
  • TRANSPARENCY
OUR TRUSTED CLIENTS INCLUDE
Careers

Stonehenge is seeking qualified individuals for specialized roles.

  • (786) 866-7776
  • 13100 SW 128th Street Miami, FL 33186
  • LIC#: CGC 1504064 • LIC#: E 1500528