Kensington Park Elementary

Project scope includes major upgrades to fire alarm system to provide coverage throughout the entire school, repairs to the security alarm system including replacement of existing damaged components and sensors, mechanical improvements include the replacement of condenser units and air handler units, replacement of the Energy Management System including new controls, and VAV boxes throughout, installation of venting (exhaust) system in selected restrooms, replacement of windows, installation of new concrete slabs, all necessary patching and painting.

Miami Springs Senior Center

This $5,225,904 project consists of a Multi-Purpose Center is a 15,127-sf facility designed to meet the needs of the Miami Springs senior community.

COPE Center North

Project includes the installation of a new 40’ x 60’ shade structure over existing playground, major mechanical improvements including the replacement of cooling system components and more.

BMQ Headquarters

Construction of a 5,400SF office building. SHC is providing Design-Build services along with architect Bellon-Milanes Architects. Project scope involves CMU construction, Twin-Tee Roofing System, with custom office finishes, exterior stucco fascia and detailed architectural features, new impact resistant window and doors. Along with state of the art IT integration.

Pump Station "E"

The Scope of work consists of construction of the PS - E 12–inch Force Main Piping Relocation including, the installation of all necessary 12-inch DIP pipe, sewage combination air valves with manholes and covers, plug valves with valve boxes, all appurtenances, and installation of the 12-inch DIP Bridge Crossing below the Commodore Trail pedestrian bridge, paving repairs over trench and constructing asphaltic concrete surfaces and restoring concrete walkways at north/ south ends of the Commodore Trail pedestrian bridge.

Miami Beach Lummus Park

Outdoor exercising park on world famous South Beach.

Coconut Palm K - 8 Academy

The scope of work included constructing a new 12-classroom building and covered walkways, building 6 new parking spaces, and relocating existing basketball courts.

Hubert O. Sibley

This project included playground repairs along with the installation of a new various new safety features and refurbishments.

Senator Villas

This $4,978,776, Design Build Project consisted of a 20,000 sf, 2 Story, 23-Unit affordable senior living facility of Miami Dade County Public Houseing. Other improvements include site preparations for a new bus shelter as well as landscaping and sidewalk improvements on the north side of Bird Road. Design Build Team, Stonehenge Construction, V3 Architectural Group and BCC Engineering.

Africair Headquarters

2-Story, 18,000 SF Commercial Office Building, Pre-Cast Reinforced Concrete Joist System, Electrical Power, Custom Office Finishes, Building Enhancements, Fire Sprinkler System, Upgraded Landscape

Construction Management
& General Contractor Services

Stonehenge Construction has a team of experienced General Contractors, Construction Managers, and Engineers working towards the common goal of completing projects on time for the right budget, without sacrificing quality.
PROUD MEMBER OF

THE STONEHENGE WAY

The “Stonehenge Way” encompasses our core values of reliability, honesty, integrity, professionalism, and transparency.
  • RELIABILITY
  • HONESTY
  • INTEGRITY
  • PROFESSIONALISM
  • TRANSPARENCY
OUR TRUSTED CLIENTS INCLUDE
Careers

Stonehenge is seeking qualified individuals for specialized roles.

  • (786) 866-7776
  • 13100 SW 128th Street Miami, FL 33186
  • LIC#: CGC 1504064 • LIC#: E 1500528