Dolphin Park & Ride

This $15,900,000, Design Build project consisted of a new 15-acre transit facility, the Dolphin Station Terminal Facility. Miami Dade County Expresswat Authority.

Coral Gables Preparatory Academy

Project scope includes the replacement of window AC units with new BARD units and associated replacement of windows as needed, water intrusion remediation including the application of waterproofing system below grade and sealing of all wall penetrations, upgrades to the PA communications system, site work includes creating a new swale for a water retention area, landscape enhancements including irrigation and sod.

Coconut Palm K - 8 Academy

The scope of work included constructing a new 12-classroom building and covered walkways, building 6 new parking spaces, and relocating existing basketball courts.

Linda Lentin K-8 Center

Project scope includes playground repairs along with the installation of a new playground safety surface, installation of new concrete walkways, replacement of cooling tower structural supports, major mechanical improvements including the replacement of major system components (i.e. pumps, condenser units, and package units), upgrades to the Energy Management System including the installation of new panels, addition of variable frequency drives, motorized dampers, and related sensors to system, upgrades to the PA communications system, replacement of carpet flooring, replacement of resilient flooring, and all necessary patching and painting.

Galloway Professional Building

Improvements and modernization of a 42,000 SF two-story office building. SHC is providing Design-Build services along with architect Deforma studio.

Pump Station "E"

The Scope of work consists of construction of the PS - E 12–inch Force Main Piping Relocation including, the installation of all necessary 12-inch DIP pipe, sewage combination air valves with manholes and covers, plug valves with valve boxes, all appurtenances, and installation of the 12-inch DIP Bridge Crossing below the Commodore Trail pedestrian bridge, paving repairs over trench and constructing asphaltic concrete surfaces and restoring concrete walkways at north/ south ends of the Commodore Trail pedestrian bridge.

El Floridita Restaurant

3,000 SF El Floridita Restaurant Front of the house and back of the house improvements.

Miami Beach Lummus Park

Outdoor exercising park on world famous South Beach.

Africair Headquarters

2-Story, 18,000 SF Commercial Office Building, Pre-Cast Reinforced Concrete Joist System, Electrical Power, Custom Office Finishes, Building Enhancements, Fire Sprinkler System, Upgraded Landscape

Palm Springs Elementary

The scope of work included: Exterior painting at Bldg. 1 through 10 including stucco repairs. New HVAC at Buildings 01.02,03,04,05, 06, 07 and 10. New EMS for HVAC. New roofing on walkway decks C, D and E and Buildings 06 07 and 10.

Construction Management
& General Contractor Services

Stonehenge Construction has a team of experienced General Contractors, Construction Managers, and Engineers working towards the common goal of completing projects on time for the right budget, without sacrificing quality.
PROUD MEMBER OF

THE STONEHENGE WAY

The “Stonehenge Way” encompasses our core values of reliability, honesty, integrity, professionalism, and transparency.
  • RELIABILITY
  • HONESTY
  • INTEGRITY
  • PROFESSIONALISM
  • TRANSPARENCY
OUR TRUSTED CLIENTS INCLUDE
Careers

Stonehenge is seeking qualified individuals for specialized roles.

  • (786) 866-7776
  • 13100 SW 128th Street Miami, FL 33186
  • LIC#: CGC 1504064 • LIC#: E 1500528